Amazon cover image
Image from Amazon.com

Estimating construction costs and schedules : experience with power generation projects in developing countries / Robert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.

By: Contributor(s): Material type: TextTextSeries: World Bank e-Library | World Bank technical paper ; no. 325. | World Bank technical paper. Energy series.Publisher: Washington, D.C. : World Bank, c1996Description: xv, 120 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 0821336703
Subject(s): Additional physical formats: Print Version:DDC classification:
  • 621.31/21 20
LOC classification:
  • TK1193.D44 B33 1996
Online resources:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
No physical items for this record

Includes bibliographical references (p. 119-120).

Description based on print version record.

There are no comments on this title.

to post a comment.

Copyright © 2024 Indian Institute of Management Visakhapatnam
Koha v23.05