000 01774cam a22004455i 4500
001 1162560
003 US-djbf
005 20210811104640.0
006 m d
007 cr cn|||||||||
008 960510s1996 dcua b 000 0 eng
010 _a96022845
020 _a0821336703
035 _a(The World Bank)96022845
040 _aDLC
_cDLC
_dDLC
_beng
_erda
043 _ad------
050 0 0 _aTK1193.D44
_bB33 1996
082 0 0 _a621.31/21
_220
100 1 _aBacon, Robert,
_d1942-
_95068
245 1 0 _aEstimating construction costs and schedules :
_bexperience with power generation projects in developing countries /
_cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.
264 1 _aWashington, D.C. :
_bWorld Bank,
_cc1996.
300 _axv, 120 pages :
_billustrations ;
_c28 cm.
336 _atext
_btxt
_2rdacontent
337 _acomputer
_bc
_2rdamedia
338 _aonline resource
_bcr
_2rdacarrier
347 _adata file
_2rda
380 _aBibliography
490 1 _aWorld Bank technical paper,
_x0253-7494 ;
_vno. 325.
_aEnergy series
504 _aIncludes bibliographical references (p. 119-120).
588 _aDescription based on print version record.
650 0 _aElectric power-plants
_xDesign and construction
_xEstimates
_zDeveloping countries.
_95069
650 0 _aElectric power-plants
_zDeveloping countries
_xCosts
_xStatistics.
_95070
700 1 _aHeidarian, Jamshid.
_95071
700 1 _aBesant-Jones, John,
_d1941-
_95072
776 0 8 _aPrint Version:
_z9780821336700
830 0 _aWorld Bank e-Library.
_95073
830 0 _aWorld Bank technical paper ;
_vno. 325.
_95074
830 0 _aWorld Bank technical paper.
_pEnergy series.
_95075
856 4 0 _uhttp://elibrary.worldbank.org/doi/book/10.1596/0-8213-3670-3
999 _c2434
_d2434