000 01825cam a22004935i 4500
001 14388312
003 US-djbf
005 20210811110849.0
006 m d
007 cr cn|||||||||
008 060524s2006 dcuab b i000 0 eng
010 _a2006047376
020 _a0821366823
020 _a0821366831
020 _a9780821366820
035 _a(The World Bank)ocm69594107
040 _aDLC
_cDLC
_dBAKER
_dC#P
_dDLC
_beng
_erda
042 _apcc
043 _af-sl---
050 0 0 _aHC1065.Z9
_bC36 2006
082 0 0 _a333.91/409664
_222
100 1 _aMazzei, Leonardo,
_d1973-
_913192
245 1 4 _aThe role of communication in large infrastructure :
_bthe Bumbuna Hydroelectric Project in post-conflict Sierra Leone /
_cLeonardo Mazzei, Gianmarco Scuppa.
264 1 _aWashington, D.C. :
_bWorld Bank,
_cc2006.
300 _axi, 42 pages :
_billustrations, map ;
_c26 cm.
336 _atext
_btxt
_2rdacontent
337 _acomputer
_bc
_2rdamedia
338 _aonline resource
_bcr
_2rdacarrier
347 _adata file
_2rda
380 _aBibliography
490 0 _aWorld Bank working paper,
_x1726-5878 ;
_vno. 84
504 _aIncludes bibliographical references (p. 41-42).
588 _aDescription based on print version record.
610 2 0 _aBumbuna Hydroelectric Project.
_913193
650 0 _aCommunication in rural development
_zSierra Leone.
_913194
650 0 _aHydroelectric power plants
_zSierra Leone.
_913195
650 0 _aInfrastructure (Economics)
_zSierra Leone.
_913196
650 0 _aWater-power
_zSierra Leone.
_913197
700 1 _aScuppa, Gianmarco,
_d1967-
_913198
710 2 _aWorld Bank.
_913199
776 0 8 _aPrint Version:
_z9780821366820
830 0 _aWorld Bank e-Library.
_913200
856 4 0 _uhttp://elibrary.worldbank.org/doi/book/10.1596/978-0-8213-6682-0
999 _c3581
_d3581